News
Southeast no longer marginalized, can boast of trillions of projects ongoing – Minister of Works Umahi

The Minister of Works, Engr. David Umahi has declared that the issue of marginalization was now a thing of the past as Southeast could boast of projects and diverse ongoing construction of infrastructure in trillions across the region.
He stated this during the inspection of Abia-Port Harcourt highway construction on Saturday, noting that there was never in history that the region benefitted infrastructure massively like the President Bola Ahmed Tinubu’s administration.
Speaking with journalists on the site, Umahi maintained that he had been ‘Deputy Governor for eight years, governor for eight years and now Minister of Works’, stating that there was no single project, but now a great number of projects were undergoing construction in the region.
He revealed that the Tinubu administration inherited 2,068 ongoing infrastructure projects nationwide valued at ₦13 trillion before the removal of fuel subsidy and naira flotation, adding that some of the contractors have been migrated to Sukuk fund for the projects to be sufficiently funded.

“To ensure these jobs don’t stop, we have migrated contractors like Arab Contractors to the Sukuk fund. They have ₦2 billion to claim immediately, and with the 2025 budget allocations, they will have access to ₦4.7bn by the end of this month,” he said.
Umahi inspected ongoing work at the Alaoji Railway overhead bridge and the Obehie axis, handled by Chinese construction giant CCECC and indigenous firm JRB, commending the performance of local contractors.
He announced a shift in construction strategy, introducing reinforced concrete pavement on the Port Harcourt-bound lane to ensure durability.
“We are building roads, not just constructing them. JRB has been mobilised on emergency grounds to fast-track the remaining sections,” he said.
The minister directed contractors handling the Enugu-Port Harcourt Expressway reconstruction to meet a target for commissioning the Aba-Imo River axis by President Tinubu.
Responding to criticisms over transparency in project execution, Umahi said he welcomed public scrutiny and accountability.
“They want me to be accountable, and I enjoy it. I am presiding over the funds of the Federation. If you have a petition, send it to the ICPC. Our projects are open for verification,” he maintained.

























